Our Projects

Kerang Levee Project


  • 30 July 2014

Project Description

Price Merrett Consulting was commissioned by Gannawarra Shire Council to conduct surveys, soil testing, design and prepare contract documents for the Kerang Town Levee Project.

The aim of the project was to;

1. Provide flood protection equivalent to the 2011 flood level.

2. Construct 2.7 km of town levee on the southern end of Kerang.

3. Flood protection at the north end of Kerang through the reconstruction and raising of roads. 

  • Client:

    Gannawarra Shire Council

Need something similar to this?

Project Videos