FAQ

Frequently Asked Questions

Please see below for a list of our most commonly asked questions


Engineering

Concrete Pipes will take higher capacity loadings than HDPE and quite often it will be cheaper to install when using open cut trench method

There isn't a general rate per ha for developments, it is usually case by case


Surveying

Trimble GPS Base and 2 Rovers

It is often best if the surveyor is one of the first contractors on site as it allows them to collect the critical information they need before the surface/physical features/levels are disturbed.

No two surveys are alike, therefore we always give a quote.